Awarded / Contract Signed

Yakamart WAEVCP2 EV Charging Award

Six DC fast charging ports for a Yakama Nation enterprise, structured as a public charging project with Amerind Nation LLC / 7 Generations serving as Tribal Representative and prime implementer.

$900,000

Awarded

6

Level 3 DC fast charging ports

180 kW

Per port, minimum 150 kW

Nov. 2026

Delivery and activation target

Featured Case Study

From sourced opportunity to negotiated award and delivery path.

Amerind Nation sourced and wrote the application, negotiated the award, and is positioned to deliver the project end-to-end from design through commissioning and the 5-year operations and maintenance period.

Program
Washington Electric Vehicle Charging Program Round 2
Grantee of record
Yakamart, Inc., an enterprise of the Confederated Tribes and Bands of the Yakama Nation
Location
111 Fort Road, Toppenish, Washington, Yakima County
Project
Six public Level 3 DC fast charging ports
Power
180 kW per port, minimum 150 kW
Operations
97% uptime commitment and 5-year minimum operating period
Timeline
Application submitted December 2025; award contract signed April 2026; deliver and activate by November 2026

Delivery Model

A Tribal enterprise keeps ownership and site revenues.

The project is structured so the Tribe retains ownership of infrastructure and site revenues, with zero out-of-pocket cost to the Tribe included as part of the delivery positioning.